Problem first
We score the operating need, not the product page.
CashPrime Operations Advisor/Product fit check
Five operating signals separate the visible symptom from the real requirement. The result may confirm this product, connect it to another layer, or tell you not to buy yet.
Product fit check
We will test whether this product addresses the root requirement or only the visible symptom.
We score the operating need, not the product page.
A result can confirm, qualify, or reject the current route.
Hardware, controls, data, service, and workflow stay connected.
Continue the equipment journey
Compare fit, test capacity assumptions, then bring the shortlist into a deployment conversation.
Equipment fit
Equipment fit
Your operating scope travels with you
Explore and save equipment, ARKASH modules, and operating touchpoints to build a live decision brief.
Move from desktop batches to configured multi-pocket production.
Choose 4+2, 6+2, 8+2 or 10+2 pockets: four, six, eight or ten 200-note stackers plus two 100-note reject pockets. The JL305 range combines a 1,000-note hopper with automatic push-out handling. Separate denomination, fitness and orientation outputs around the required downstream process.
Manufacturer reference photograph. Confirm the supplied configuration.
Choose pocket rules around downstream packing and ATM preparation.
A large hopper and push-out handling support continuous operator cycles.
Agree serial capture, batch identifiers and exception exports.
Manufactured in China by
Julong Co., Ltd.
JL305 Series
Official two-page CashPrime edition
Share your workload, currency mix and current bottleneck with CashPrime.
JL305 production fit
JL305 is a multi-pocket production family offered in 4+2, 6+2, 8+2 and 10+2 configurations. A 1,000-note hopper and automatic push-out handling support longer runs, while each installation needs a deliberate output map and site layout.
Acceptance checkpoint
Approve the exact 4+2, 6+2, 8+2 or 10+2 model with a pocket map, layout drawing and measured acceptance batch.
Configuration decision
Map denominations, fitness grades, orientations, ATM preparation and rejects to the required pockets. An unused stacker adds cost and footprint without removing work.
Production test
Measure hopper replenishment, automatic push-out, full-pocket recovery, exception handling and downstream bundle preparation with the quoted configuration.
Choose JL303 when
Use the smaller 2+1-pocket JL303 when additional live destinations do not eliminate a repeat pass or justify the larger production footprint.
Turn the page into a testable decision.
Capture the workload, constraint and required evidence, then review the fit with an operations specialist.
From machine specification to operating outcome
Currency files, fitness thresholds and certificates are revision-specific. Confirm EGP, SAR and AED with representative notes; a catalogue list is not acceptance evidence.
Move from desktop batches to configured multi-pocket production.
Manufacturer footage; the shown revision and configuration may differ from the final quotation. Loads from Julong only when you choose to play.