Problem first
We score the operating need, not the product page.
CashPrime Operations Advisor/Product fit check
Five operating signals separate the visible symptom from the real requirement. The result may confirm this product, connect it to another layer, or tell you not to buy yet.
Product fit check
We will test whether this product addresses the root requirement or only the visible symptom.
We score the operating need, not the product page.
A result can confirm, qualify, or reject the current route.
Hardware, controls, data, service, and workflow stay connected.
Continue the equipment journey
Compare fit, test capacity assumptions, then bring the shortlist into a deployment conversation.
Equipment fit
Equipment fit
Your operating scope travels with you
Explore and save equipment, ARKASH modules, and operating touchpoints to build a live decision brief.
1+1 Pocket Banknote Sorter — Compact Desktop — FPGA + DSP
1+1 pocket compact desktop banknote sorter with FPGA and DSP dual-core processing. Dual CIS scanning for fitness sorting, denomination recognition, orientation, and serial number reading in a small form factor.

Dual-core FPGA and DSP processing architecture for fast, accurate banknote analysis in a compact form factor.
Multi-criteria fitness evaluation separates fit from unfit notes for efficient cash recirculation.
Space-saving 1+1 pocket design ideal for teller desks and limited workspace environments.
Reads and logs serial numbers for audit trail and traceability compliance.
FIT — Fitness
Sort fit from unfit notes
DENOM — Denomination
Sort by denomination
ORIENT — Orientation
Arrange notes same direction
VER — Version
Sort by version/series
SN — Serial Number
Read and log serial numbers
BATCH — Batch
Batch counting per stacker
Purchase decision intelligence
Specifications prove capability. A sound decision must also prove workload, control and integration fit.
CashPrime decision rule
Start with operating evidence, not a model name.
Workload fit
Size against peak-hour volume, batch shape and available operating time, not the daily average alone.
Evidence on this page
Control fit
Confirm which risk, accuracy or accountability gap the machine must remove from the current workflow.
Evidence on this page
Integration fit
Check interfaces, reporting and ownership before deployment so the machine does not become an isolated endpoint.
Evidence on this page
Turn specifications into a testable decision shortlist.
Test capacity, compare alternatives, then let the Operations Advisor challenge the fit.
Manufactured in China by
Shanghai Guao Electronic Technology Co., Ltd.
GA-QFJ2101
Official two-page CashPrime edition
Contact CashPrime for a custom quote or a live demonstration of the GA-QFJ2101.