
Parcel processing & sorting
SNBC Singulator
Separate a parcel stream before downstream identification and sorting.
Specifications & brochureCashPrime · SNBC · Egypt & the Gulf
A traceable journey for every parcel.
Connect parcel identification, singulation, sorting and handover. Plan capacity around your parcel mix, peak arrival pattern and exception lane, not a headline conveyor speed.
Explore 8 products & configurations8 of 8 products and configurations

Parcel processing & sorting
Separate a parcel stream before downstream identification and sorting.
Specifications & brochure
Parcel processing & sorting
Six-sided parcel identification within a configured dimensioning and weighing line.
Specifications & brochure
Parcel processing & sorting
Route parcels through a narrow-belt sorting arrangement.
Specifications & brochure
Parcel processing & sorting
Directional parcel transfer using the balance-wheel sorting format.
Specifications & brochure
Parcel processing & sorting
A loop-format sorting layout for multiple parcel destinations.
Specifications & brochure
Parcel processing & sorting
A linear sorting layout for a site-specific parcel flow.
Specifications & brochure
Parcel processing & sorting
Automate parcel supply into the configured sorting line.
Specifications & brochure
Parcel processing & sorting
A flexible sorting scheme scoped around destination and space requirements.
Specifications & brochureSupply the smallest, largest, heaviest and most difficult parcels, including soft bags and damaged labels.
Agree measured sustained throughput, no-read routing, jam recovery, emergency stops and safe maintenance access.
Reconcile barcode, dimensions, weight and destination events with the WMS or carrier system. Define offline and duplicate-event behaviour.
Availability, software, security, power and certification depend on the model, configuration and quotation. ARKASH, ERP or WMS compatibility is not assumed: integration interfaces and acceptance tests are defined for each project.
Discuss your project scopeSee equipment in context, then confirm that the revision matches your quotation. A complete-line video does not establish the performance or compatibility of each component independently.